Apr 27, 2024 7 Rivet Filling Category: Fuselage
Lots of rivet filling over the past two days. Finished the top/bottom of HS and elevator. Had to clean up some left over pro-seal on the right bottom wing and filled those rivets with superfill. After between 12-24 hours, used the dremel with a polishing wheel to lightly sand off the excess on each rivet without damaging the metal.